Paying for the privilege: Reluctant landowners and the UK’s coverage shortfall

Written by
Luke Maidens
November 24, 2026

Why the mismatch between burdens telecoms landlords bear in hosting a site, as against the compensation they receive, is holding back network rollout.

Introduction

It’s well established that UK telecoms coverage is not where it needs to be. Various reasons about why that might be the case have been doing the rounds recently.

Needless to say, the position isn’t straightforward. However, the impact of telecoms legal reforms in 2017 has left many landowners increasingly reluctant to deal with operators, at all.

The fact of the matter is, therefore, that if the UK is serious about closing its coverage gap, as a starting point, it needs landowners who are willing to say yes.

Burdens

One reason why landowners might currently be reluctant to host telecoms apparatus on their land is the mismatch between the actual burden this involves, as against the amount landowners are currently paid by way of compensation.  

This article sets out what landowners might expect to be offered for the burden of hosting a telecoms site, what those burdens actually are in practice, and the mismatch between the two.

1. What might landowners currently expect to be paid

Compensation obviously varies depending upon the specific type of telecoms site.

• The current benchmarks put all benefits and burdens on a greenfield site at about £800  a year (after inflation);

• burdens on a water tower are valued at about £1,550  per annum; and

• burdens on a residential rooftop have been valued at approximately £3,500 per annum , taking into account managing access and future facilities management.

For many landowners, particularly those with Central London properties, for example,  (where network coverage issues are particularly acute and property management costs are high), these amounts are relatively de-minimis and simply do not reflect the true cost of hosting a telecoms site.

2. What the burdens actually are

Telecoms case law itself records a substantial list of burdens. In Vache Farm (a greenfield site), for example, the Tribunal identified the following as more onerous than those of a passive, low-intensity letting:

• Security of tenure. Once Code rights are in place, recovering the site for redevelopment is difficult, slow and expensive. In our experience, taking back the site will realistically take 18-24 months minimum, and the cost is disproportionate to the rent received.  

• Frequent access by multiple operators. At Vache Farm, 33 requests for access were recorded in a single year, through a stable yard and across a field with horses in it.

• Future upgrade works. The Tribunal anticipated "significant additional access and activity" during upgrades, with 5G works likely during the term.

• Rights over adjacent land. Set-down areas, cable routes and tree lopping all reach beyond the demised site and impact (potentially significantly) upon a landowner’s property, other tenants and occupiers etc.

Other burdens:

• Sharing without extra payment. Each additional sharer means more visits, more equipment and more coordination. The 2017 Code generally prevents a separate charge being made for sharing; the landlord is instead left to recover any resulting loss through consideration or a compensation claim.

• Management and supervision. In some instances (dependent upon the type of building or land in question), these frequent operator visits will require landlord supervision.

• Sites on residential buildings. Residential rooftop landlords must manage and protect residents, keep records of contractors, and, crucially, they also have very onerous responsibilities to consider and comply with under the Building Safety Act;

• Damage to roof coverings and difficulties carrying out periodic maintenance. It’s not unknown for operators/their contractors to inadvertently damage delicate roof coverings. In this outcome, or simply where the roof needs periodic maintenance or replacement, relocating the operators to do so can be very costly and significantly delay the necessary works.

• Maintenance of access routes. Landlords can often be required to keep accessways, tracks etc. in good repair, for the operator’s use.

• Maintenance of structures. What is the position, for example, in relation to telecoms apparatus on a redundant water tower, or chimney? Who foots the (potentially substantial) repair bills for these structures?

• Electricity supply. Often, a telecoms operator will want to tap into the landowner’s electricity supply. In turn, this could result in landowners paying out very substantial amounts of money on an operator’s behalf, then seeking to claim that cost back. Often, the current compensation payments simply do not cover the time incurred in  doing so, nor reflect the money cost of sums paid out on an operator’s behalf, to be recovered later.

This is not necessarily an exhaustive list!

These burdens fall across everyone with an interest in the land, including head landlords and intermediate site providers, who must manage access and the relationship between operators and landowners.

Compensation. The cost of enforcing rights.

Whilst, in some instances, it may be possible for landlords to claim additional compensation in respect of some of these burdens during the term of the lease, the onus to do so is on the landlord, who must identify the loss, quantify it, claim it and, if the operator resists, litigate for it.

In respect of smaller amounts, it simply may not be cost-effective to do so. This leaves landowners out of pocket.

3. Why the mismatch matters for coverage

Most landlords accept the public interest in connectivity. What they object to is carrying real, recurring costs in hosting sites for telecoms operators, who are themselves profit making companies.  

The policy behind the 2017 Code was to make sites cheaper and so (in theory) speed up rollout. But a regime that leaves willing hosts out of pocket does not create willing hosts.

The mismatch between burden and award is not an abstract valuation point. It is one reason why sites are being lost, not replaced and coverage is not improving. Should addressing this (along with other obvious fixes) be viewed as the price of better coverage?

How we can support you

If you’re a landlord or site provider seeking advice on a telecoms matter, Luke Maidens and our Real Estate Litigation team can help. We act exclusively for landlords and site providers in telecoms disputes under the Electronic Communications Code. Visit our telecoms page to find out how we can support you.

Case references

[1] EE & H3G v AP Wireless II (Vache Farm) [2024] UKUT 216 (LC). It is not possible to split out the burden figure alone.

[2] EE & H3G v Affinity Water [2022] UKUT 08 (LC).

[3] CTIL v London & Quadrant (Maple House) [2020] UKUT 282 (LC).

This article is for general information only and does not constitute legal advice. Figures are drawn from reported decisions and may be updated by later authority.

‍